Changes have been introduced for permitted development (PD) relating to mobile telecommunications infrastructure; a new rule applies allowing new masts of up to 20 metres in protected areas in England.
Brandon Lewis (Minister of State for Housing and Planning) writes:
Where a site is already used for telecommunications infrastructure, we will extend permitted development rights to allow taller ground based masts to be built. The threshold for new ground based masts will increase from 15 metres to 25 metres in non-protected areas and a new permitted development right allowing new masts of up to 20 metres will be introduced in protected areas. To ensure that there is appropriate community engagement a prior approval will apply where a new mast is being built, meaning consideration will always be given to how to minimise the visual impact of masts.
Operators will also be able to increase the height of existing masts to 20 metres in both non-protected and protected areas without prior approval; between 20 metres and 25 metres in non-protected areas with a prior approval; and have a new automatic right to upgrade the infrastructure on their masts in protected areas to align with existing rights in non-protected areas. There will be a height restriction of 20 metres on highways and residential areas to accommodate vehicle lines of sight and pedestrian access.
View the full statement