{"id":31254,"date":"2021-09-24T17:59:43","date_gmt":"2021-09-24T16:59:43","guid":{"rendered":"https:\/\/newsblogsnew.ihbc.org.uk\/?p=31254"},"modified":"2021-09-24T18:45:52","modified_gmt":"2021-09-24T17:45:52","slug":"ihbccop26-features-climate-from-the-engineers-doorstep-climate-backlash-as-stonehenge-and-lower-thames-crossing-top-construction-pipeline","status":"publish","type":"post","link":"https:\/\/newsblogs.ihbc.org.uk\/?p=31254","title":{"rendered":"IHBC@COP26 features \u2018Climate from the engineers\u2019 doorstep\u2019: Climate backlash as Stonehenge and Lower Thames Crossing top construction pipeline"},"content":{"rendered":"<div class=\"pc_wrap\">\n<div class=\"picture_legacy\">\n<h3><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-30590\" src=\"https:\/\/newsblogs.ihbc.org.uk\/wp-content\/uploads\/2021\/07\/New-Civil-Engineer-160721.png\" alt=\"\" width=\"259\" height=\"225\" \/>The government has been accused of making a mockery of its own net zero carbon emissions targets by including billions of pounds worth of road contracts in its 10 year construction pipeline.<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-31189 alignleft\" src=\"https:\/\/newsblogs.ihbc.org.uk\/wp-content\/uploads\/2021\/09\/IHBCHelpdeskCOP26-300x276.png\" alt=\"\" width=\"189\" height=\"174\" \/><!--more--><\/p>\n<\/div>\n<div class=\"pc_header\">\n<div class=\"wrapper-sleeve\">\n<div id=\"crumbtrail\">\n<h2 style=\"padding-left: 40px;\"><em><span style=\"color: #800080;\">&#8230;Stonehenge Tunnel (\u00a32bn) and the Lower Thames Crossing Northern Link roads contract (\u00a32bn) among the biggest contract opportunities included in the pipeline&#8230;<\/span><\/em><\/h2>\n<p><em>New Civil Engineer<\/em> writes:<\/p>\n<p>Transport campaigners have said that the government\u2019s Build Back Better agenda is undermined by the prevalence of road schemes in the \u00a3650bn pipeline. <a href=\"https:\/\/www.newcivilengineer.com\/latest\/government-reveals-650bn-construction-pipeline-13-09-2021\/\">In total, 12 road contracts worth \u00a313.23bn are included in the pipeline.<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"content-wrap layout-picture_content\">\n<div id=\"wrapper_sleeve\" class=\"content-inner-wrap\">\n<div class=\"content container\">\n<article class=\"post-listing post-231624 post type-post status-publish format-standard has-post-thumbnail hentry category-latest tag-dft tag-lower-thames-crossing tag-national-highways tag-stonehenge-tunnel editorial-roads editorial-tunnels\">\n<div class=\"post-inner\">\n<div class=\"entry\">\n<p>The pipeline\u2019s biggest four contracts by value also all relate to roads jobs. The two biggest contract opportunities are both worth \u00a34bn&#8230;.<\/p>\n<p>The main works contract for the Stonehenge Tunnel (\u00a32bn) and the Lower Thames Crossing Northern Link roads contract (\u00a32bn) are also among the biggest contract opportunities included in the pipeline&#8230;.<\/p>\n<p><a href=\"https:\/\/www.newcivilengineer.com\/latest\/backlash-as-stonehenge-tunnel-and-lower-thames-crossing-top-construction-pipeline-14-09-2021\/\" target=\"_blank\" rel=\"noopener\">Read more&#8230;.<\/a><\/p>\n<p>See also the <a href=\"https:\/\/ihbcatcop26.ihbc.org.uk\/\">IHBC@COP26 \u2018Conservation Helpdesk+\u2019<\/a> and for more background on the IHBC@COP26 see <a href=\"https:\/\/newsblogs.ihbc.org.uk\/?p=31188\" target=\"_blank\" rel=\"noopener\">NewsBlog<\/a><\/p>\n<\/div>\n<\/div>\n<\/article>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The government has been accused of making a mockery of its own net zero carbon emissions targets by including billions of pounds worth of road contracts in its 10 year construction pipeline.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-31254","post","type-post","status-publish","format-standard","hentry","category-ihbc-newsblog"],"_links":{"self":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/31254","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31254"}],"version-history":[{"count":2,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/31254\/revisions"}],"predecessor-version":[{"id":31272,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/31254\/revisions\/31272"}],"wp:attachment":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31254"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31254"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31254"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}