{"id":18108,"date":"2018-02-13T17:45:18","date_gmt":"2018-02-13T17:45:18","guid":{"rendered":"http:\/\/ihbconline.co.uk\/newsachive\/?p=18108"},"modified":"2018-02-13T17:45:18","modified_gmt":"2018-02-13T17:45:18","slug":"ihbc-cpd-check-on-building-design-at-dbw-and-maybe-make-your-own-contributions-on-heritage-issues-too","status":"publish","type":"post","link":"https:\/\/newsblogs.ihbc.org.uk\/?p=18108","title":{"rendered":"IHBC CPD check: On \u2018Building Design\u2019, at DBW \u2013 and maybe make your own contributions on heritage issues too!"},"content":{"rendered":"<h3><a href=\"https:\/\/newsblogs.ihbc.org.uk\/wp-content\/uploads\/2018\/02\/DBW_image.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-18109\" src=\"https:\/\/newsblogs.ihbc.org.uk\/wp-content\/uploads\/2018\/02\/DBW_image.png\" alt=\"DBW image\" width=\"300\" height=\"221\" \/><\/a>IHBC members may find a useful introduction to the thorny subject \u2018Building Design\u2019 in an article on Designing Buildings Wiki (DBW), and as it can be edited, anyone with special skills, interests or concerns on the topic may add to the content too, such as on design and conservation issues, enhancing their own CPD as well as extending their professional profile .<\/h3>\n<p><!--more--><\/p>\n<p>On \u2018design development\u2019, for example, the article notes:<\/p>\n<p>The\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Design_process\">design process<\/a>\u00a0is an iterative one, passing through a number of stages, during which the\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Client%27s\">client&#8217;s<\/a>\u00a0requirements are clarified, options assessed, designs developed, designs reviewed, progress approved, a decision taken to move to the next stage. Certain aspects of the project are &#8216;frozen&#8217; at each stage and\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Change_control_procedures\">change control procedures<\/a>\u00a0introduced.<\/p>\n<p>Typically, the stages of design are described as:<\/p>\n<ul>\n<li><a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Concept_design\">Concept design<\/a>(outline design or\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Scheme_design\">scheme design<\/a>).<\/li>\n<li><a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Detailed_design\">Detailed design<\/a>.<\/li>\n<li><a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Technical_design\">Technical design<\/a>.<\/li>\n<li><a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Production_information\">Production information<\/a>.<\/li>\n<\/ul>\n<p>See\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Comparison_of_work_stages\">Comparison of work stages<\/a>\u00a0for more information.<\/p>\n<p>The stages which precede\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Concept_design\">concept design<\/a>\u00a0typically involve developing the brief, assessing options and carrying out\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Feasibility_studies\">feasibility studies<\/a>. Whilst these stages might include the preparation of diagrams for the purpose of assessment, they do not involve design as such.<\/p>\n<p><a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Design_reviews\">Design reviews<\/a>\u00a0should be co-ordinated by the\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Lead_designer\">lead designer<\/a>.\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Design_reviews\">Design reviews<\/a>\u00a0might include consideration of (amongst other things)\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Design_quality\">design quality<\/a>,\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Value_management\">value management<\/a>, design\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Risk_assessment\">risk assessment<\/a>\u00a0and project\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Risk_assessment\">risk assessment<\/a>. See\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Design_review\">Design review<\/a>\u00a0for more information.<\/p>\n<p>In some circumstances it may be appropriate to commission\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Design_reviews\">design reviews<\/a>\u00a0from\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Independent_client_advisers\">independent client advisers<\/a>\u00a0or from\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Specialist\">specialist<\/a>\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Design_review\">design review<\/a>\u00a0organisations (such as\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Design_Council_Cabe\">Design Council Cabe<\/a>).<\/p>\n<p>On public sector projects, the government requires that\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Gateway\">gateway<\/a>\u00a0reviews are carried out at key points during the development of the project. See\u00a0<a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Gateway_review_process\">Gateway review process<\/a>\u00a0for more information\u2026.<\/p>\n<p>For more see <a href=\"https:\/\/www.designingbuildings.co.uk\/wiki\/Building_design\" target=\"_blank\" rel=\"noopener\">DBW<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>IHBC members may find a useful introduction to the thorny subject \u2018Building Design\u2019 in an article on Designing Buildings Wiki (DBW), and as it can be edited, anyone with special skills, interests or concerns on the topic may add to &hellip; <a href=\"https:\/\/newsblogs.ihbc.org.uk\/?p=18108\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-18108","post","type-post","status-publish","format-standard","hentry","category-ihbc-newsblog"],"_links":{"self":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/18108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18108"}],"version-history":[{"count":1,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/18108\/revisions"}],"predecessor-version":[{"id":18110,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/18108\/revisions\/18110"}],"wp:attachment":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18108"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18108"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}