{"id":12814,"date":"2016-05-24T15:04:51","date_gmt":"2016-05-24T14:04:51","guid":{"rendered":"http:\/\/ihbconline.co.uk\/newsachive\/?p=12814"},"modified":"2016-05-24T15:04:51","modified_gmt":"2016-05-24T14:04:51","slug":"new-welsh-he-laws-in-force-from-21-may","status":"publish","type":"post","link":"https:\/\/newsblogs.ihbc.org.uk\/?p=12814","title":{"rendered":"New Welsh HE laws in force from 21 May"},"content":{"rendered":"<p>Some of the measures in the Historic Environment (HE) (Wales) Act 2016 (\u2018the 2016 Act\u2019) came into force on 21 May 2016, two months after the legislation received Royal Assent, including measures relating to Temporary Stop Notices, Urgent Works and Immunity from Listing.<\/p>\n<p>Prior to 21 May, Cadw writes:<\/p>\n<p>\u2018Several amendments to the Planning (Listed Buildings and Conservation Areas) Act 1990 (\u2018the 1990 Act\u2019) will also take effect on 21 May. A few technical amendments will come into force, but there are also more important changes to the existing systems for the protection and management of listed building, which are discussed below.<\/p>\n<p><span style=\"text-decoration: underline;\">Temporary stop notice (section 29)<br \/>\n<\/span>While the 1990 Act incorporated an enforcement notice for listed buildings, it provided no powers to\u00a0require an immediate stop to unauthorised works. The 2016 Act remedies that omission by giving Welsh local planning authorities powers to issue temporary stop notices for listed buildings.<\/p>\n<p>The notice will require specified works to be stopped for 28 days from the date it is first posted on the building. If an agreed resolution to the situation cannot be reached while the works are suspended, the notice can be followed by further enforcement action or prosecution.<\/p>\n<p>Failure to comply with a temporary stop notice constitutes an offence in addition to any offence arising from the unauthorised works. Since a temporary stop notice is of limited duration, there\u00a0is no provision for a right of appeal. However, a claim for compensation may be admitted if a notice is served incorrectly or withdrawn without a grant of\u00a0listed building consent.<em>\u00a0<\/em><\/p>\n<p><span style=\"text-decoration: underline;\">Amendments to urgent works (section 30(1)\u2013(5))<br \/>\n<\/span>The amendments that will come into force on 21\u00a0May will broaden the scope of the urgent works that local planning authorities and the Welsh\u00a0Ministers can undertake for the preservation of a\u00a0listed building. It will now be possible to undertake urgent works on any listed building provided that they do not unreasonably interfere with its\u00a0residential use. The provisions of the 2016 Act that introduce a land charge to assist with the recovery of the costs of urgent works will not come into effect until necessary secondary legislation containing interest rate regulations has been passed by the National Assembly for Wales. The intention is to consult on\u00a0those regulations in summer 2016.<em>\u00a0<\/em><\/p>\n<p><span style=\"text-decoration: underline;\">Application conditions for certificates of immunity from listing (section 27)<br \/>\n<\/span>An application for a certificate of immunity from listing \u2014 which provides assurance that a historic building will not be listed for 5 years \u2014 will be admitted at any time. Planning permission, either granted or applied for, will no longer be a\u00a0prerequisite.<\/p>\n<p><a href=\"http:\/\/www.legislation.gov.uk\/ search?title=&amp;year=2016&amp;number=4&amp;type=anaw\u2019\">Read\u00a0the\u00a0full text<\/a> of the Act and its accompanying Explanatory Notes<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Some of the measures in the Historic Environment (HE) (Wales) Act 2016 (\u2018the 2016 Act\u2019) came into force on 21 May 2016, two months after the legislation received Royal Assent, including measures relating to Temporary Stop Notices, Urgent Works and &hellip; <a href=\"https:\/\/newsblogs.ihbc.org.uk\/?p=12814\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-12814","post","type-post","status-publish","format-standard","hentry","category-sector-newsblog"],"_links":{"self":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/12814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12814"}],"version-history":[{"count":1,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/12814\/revisions"}],"predecessor-version":[{"id":12815,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=\/wp\/v2\/posts\/12814\/revisions\/12815"}],"wp:attachment":[{"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12814"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/newsblogs.ihbc.org.uk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}